Unlimited Revisions: The Clause That Makes a Project Never End

K03high severitya clause to check for· Last updated 2026-10-09
The short version

Open-ended revision obligations ("until Client is satisfied") mean unbounded free labor — satisfaction is subjective, so there is no finish line and no breach. Fix: cap the rounds ("2 rounds requested within 14 days of delivery") and bill additional rounds at your standard rate.

Why this clause bites

Open-ended revision obligations ("until Client is satisfied") mean unbounded free labor. Satisfaction is subjective, so there is no finish line and no breach — the project just never ends.

The wording to look for

Illustrative wording — if your contract says anything close to this, the trap is live. The dangerous phrases are highlighted:

Contractor shall make any and all revisions requested by Client until Client is fully satisfied with the deliverables.

Highlighted phrases are the ones that create the risk — trade them out with the fix below.

The standard fix — send this back

Replace with: "Includes up to 2 rounds of revisions requested within 14 days of delivery. Additional rounds are billed at the standard hourly rate."

Written to be forwarded to the client directly — polite, professional, and sourced (see below).

Why "satisfied" has no finish line

A subjective standard cannot be breached. If the obligation is to revise until the client is satisfied, then no delivery is ever final and no refusal to pay is ever late — the client's opinion is the only measure, and they hold it.

The cost is easy to under-count because each round looks small. Three additional rounds at six hours each is 18 hours; at $100/hour that is $1,800 of unbilled work on a project that was already priced. (Illustrative figures.) Repeat across a year and it is the difference between a working business and a busy one.

This is why the fix is not "be a better designer". It is a number in the contract.

Three revision clauses you can paste

1. Capped rounds with a window. "The fee includes two rounds of revisions. Revision requests must be delivered in a single consolidated list within 14 days of each delivery."

2. Additional rounds priced and prepaid. "Additional revision rounds are billed at Contractor's standard hourly rate, payable before the round begins."

3. Acceptance by silence. "Deliverables not objected to in writing within 7 days of delivery are deemed accepted."

Together these answer the only three questions that matter mid-project: how many rounds, by when, and at what price. Without them, each of those questions is answered by whoever is more patient — usually the client.

How to kill the loop mid-project

One list per round. Ask for feedback consolidated into a single message rather than a stream of one-line notes. Round count is what the contract prices, and streamed feedback turns one round into five.

A written sign-off at each boundary. A two-line email — "round 2 delivered, revisions closed, next round begins at your instruction" — is the cheapest scope insurance you will ever buy.

Separate a revision from a change. A revision adjusts work already agreed; a change replaces the brief. When a request changes the brief, quote it as a change order, in writing, before doing it. Most "endless revision" projects are endless because nobody drew that line out loud.

The pricing move that keeps you flexible

Clients do not actually want infinite revisions; they want not to be surprised. Build two rounds into the quote, state the number in the proposal, and offer additional rounds as a prepaid block.

That structure keeps you flexible and still ends the project: flexibility becomes a product you sell instead of scope you absorb.

If you have already promised unlimited revisions — on a marketplace listing, say — the recovery path is a written acceptance window and a change-order habit, not a renegotiation mid-flight.

Promised "unlimited revisions" already, or selling on Fiverr? The revision playbook covers the cap, the acceptance window, and the way out.

Read the playbook →

Questions freelancers ask

How many revision rounds are standard?

For most freelance projects, 1–3 rounds is the common industry range; many freelancers quote 2. Nothing in the law fixes the number — which is exactly why writing it down matters.

Can I stay flexible without an 'unlimited' clause?

Yes — cap included rounds in writing and offer additional rounds at your standard hourly rate. That turns flexibility into something you can price instead of scope you cannot end.

Source reference: Freelance industry standard practice; AIGA / freelance association guidance on scope

Every finding in a ContractShield report cites the same public resource this guide is based on — verify it yourself before you act on it.

Related contract traps

Check your own contract for this trap

Paste your client's contract into the scanner — in 60 seconds you'll see every one of these traps that's actually in it. First scan free, no account needed.

After the scan, decide on the evidence. If it flags something you would actually send back, $9 unlocks the full report for that one contract — every finding written out, with the wording to send. If it flags nothing worth fixing, buy nothing and keep the free list.What $9 buys, and when not to buy it →

Scan a contract free →

Educational content only — not legal advice, and it creates no attorney–client relationship. For anything material to you, consult a licensed attorney in your state.